Frost Footing The trench was dug into the 3' building pad (then down another 18") to the perimeter dimensions of the building footprint. Concrete blocks are placed on top of the footing to create the frost foundation.
|
|
Back |
|
Copyright © 2002- Wright Track Enterprises, Inc. All rights reserved. |